I -405 Design-Build Project
Orange County Transportation Authority (OCTA)

The Orange County Transportation Authority (OCTA) in cooperation with the California Department of Transportation (Caltrans) selected OC 405 Partners to design and construct the I-405 Improvement Project (Project). Hout Construction Services, Inc., is providing Design-Build Coordination and Financial Business Management Services on the project.
Key elements of this approximate 16-mile widening project include:
• Addition of a general-purpose lane in each direction of I-405 from Euclid St to the I-405/I-605 Interchange.
• Addition of a tolled express lane in each direction from SR-73 to SR-22.
• Addition of auxiliary lanes in the NB direction at Euclid St off-ramp; and from Seal Beach Blvd on-ramp to the WB SR-22/7th Street off-ramp.
• Extension of existing SB auxiliary lane from Harbor Blvd off-ramp to Euclid St on-ramp.
• Removal of SB auxiliary lane from Beach Blvd to Magnolia St off-ramp.
• Reconfiguration of interchanges and ramps comprised of 23 new or replacement crossroad/ramp bridges, one pedestrian bridge, and seven bridge widenings on I-405.
• New, modified or replaced structures, including two overhead railroad crossings.
• New and upgraded drainage facilities.
• Pavement construction and revised delineation.
• Tolling infrastructure.
• Coordination with utility owners for relocation of known utilities.
