California High Speed Rail Initial Construction Section
California High Speed Rail Authority
Project executive responsible for leading the Stantec/Jacobs Design Team as part of a Design-Build (D-B) team to plan, design, build, and operate a high speed rail system (System). Led the Statement of Qualifications (Phase 1) with the construction joint venture team of Dragados USA – Samsung – Pulice – CC Myers and secured a position on the short list with the California High Speed Rail Authority (CAHSRA) for the initial $2 billion construction segment in Fresno. The D-B process is currently in Phase 2 of the RFP process.
LAX In-Line Security Baggage Screening
Los Angeles World Airport (LAWA)
Served as the project executive responsible for project construction management of the in-line security baggage screening at the North Terminals at Los Angeles International Airport (LAX). This project involved the day-to-day construction management of $192 million improvements. The improvements encompassed the public area refurbishment in Terminals 1, 2, and 3, as well as the construction of the in-line baggage screening system to host the Transportation Security Administration’s (TSA) equipment. Terminal 1 and 2 involved a 21,000 square feet of new free standing building hosting two Explosive Detection Systems (EDS) and Baggage Inspection Room (BIR). Terminal 3 involved new Baggage Handling System (BHS) in a 35,000-square-foot renovated space to host two EDSs and two BIRs.
bottom of page